Loading details...
| Scroll timeline | Mouse-wheel or drag the scrollbar |
| Zoom in / out | Use the zoom selector in the toolbar (hour β year) |
| Jump to today | Click the Today button in the toolbar |
| Expand / collapse rows | Click the βΆ / βΌ arrow in the grid |
| Open task editor | Double-click any bar or row |
| Move a bar | Drag it left / right on the timeline |
| Resize a bar | Drag the right edge of the bar |
| Multi-select + move | Hold Ctrl and click bars, then drag |
| Undo / Redo | Ctrl+Z / Ctrl+Y |
| π Holidays button | Toggle public-holiday column highlighting |
| π¨ Artists βΎ button | Show/hide per-artist absence overlay lines |
| Add holidays | Settings βΊ Holidays tab β paste URL or import CSV |
Shows a cumulative staircase curve for each event type (milestones, deliverables, checkpoints, etc.) drawn over the Gantt timeline.
| Toggle on / off | Click π Trackable in the toolbar |
| Add / edit events | Settings βΊ π Trackable Days tab |
| X axis | Event date, aligned to the gantt column for that day |
| Y axis | Cumulative count within each type (0 β 100%) |
| Colours | Set per-event in the Trackable Days editor; legend shown top-right of the strip |
| Project filter | Events tagged to a project only show when that project is active |
| Import bulk data | CSV import in Settings βΊ Trackable Days (columns: date, label, type, color) |
| Group by | Use the Group-by selector in the toolbar (Project, Folder, Assigneeβ¦) |
| Filter tasks | Click the Filter button β filter by status, assignee, task type, date range |
| Search | Type in the search box in the top toolbar |
| PDF export | Toolbar β PDF button |
| CSV / Excel | Toolbar β Export button β choose columns |
| iCal feed | Toolbar β iCal button β subscribe in any calendar app |